Browsing as guestGuest
Decisions
What you've decided, and why.
- Go with a steel frame instead of glulamDecided 2025-12-04
Context: Glulam quoted 22% higher and needed a longer lead time (14 weeks vs 6).
Decision: Selected steel from Barrett Fabrications. Slightly more intrusive but keeps us on programme and £6k under budget.
- Retain existing side return wallDecided 2025-11-18
Context: Options were: retain (cheaper, keeps character), rebuild in matching brick (uniform, +£8k), or full glazing (bright, +£14k, overheating risk).
Decision: Retain existing wall, repoint and insulate internally. Best value and matches conservation-area brief.
- Concrete rather than engineered timber floorDecided 2025-10-30
Context: Underfloor heating performs better with slab; timber would require deeper build-up and risked step down to garden.
Decision: Insulated concrete slab with wet UFH throughout the new area.